English Japanese
MKP ENGINEERING LLC

Experience / Achievements

Career / Experience / Achievements

  • Name : Masahito Komiyama
  • Place of Birth : Kofu city Yamanashi prefecture, Japan
  • Date of Birth : 12th March, 1958

In 1982, graduated from the master course of Tokyo Institute of Technology,and joined Mitsubishi Heavy Industries, Ltd. and have been engaged on design work for diesel engine power plant for 34 years.
Especially worked for plant of foreign countries, negotiated with customers, had meetings for plant job, had business trip abroad four(4) or five(5) times per year.
In 2016, retired Mitsubishi Heavy Industries, Ltd. and established a company named ‘MKP Engineering LCC’.
Please refer to ‘Business Record’ part.

EDUCATION

March, 1976 Yamanashi Prefecture Kofu First High School Date of Graduation
 March, 1980Tokyo Institute of Technology Date of Graduation
 March, 1982 Master course of Tokyo Institute of Technology Date of Graduation

OCCUPATIONAL CAREER

※You can scroll horizontally

date work experience
remarks
April 1982 Joined Mitsubishi Heavy Industries, Ltd.  

April 1982

-August 1984

Plant planning in Diesel Designing Section, Diesel Department, Yokohama Dockyard  

September 1984

-March 1988

Development of new diesel engine in Diesel development center, Power system headquarters  

April 1988

-August 1989

Plant designing of Japanese ODA project for Liberia Electric Co. (Ph.1&Ph.2) 5MW x (1+1) diesel plant

September 1989

-December 1990

Plant designing of Japanese ODA project for Senegal Electric Co, 5MW x 2 diesel plant

January 1991

-July 1993

Plant designing and commissioning for Commonwealth Utilities Corporation in Saipan (Ph.1 & Ph.2) 13MW x (2+2) diesel plant

August 1993

-December 1995

Plant designing for Japan Power Generation Co. in Pakistan 5.65MW x 24 diesel plant

January 1995

-March 1997

Plant designing for Hopewell Co. in Philippine as Project Manager for Ph.1 & Ph.2 3.75MW x 4 diesel plant

April 1997

-September 2001

Plant designing and commissioning for Full turn key project for Kenya Power Company in Kenya as Project Manager 12.25MW x 6 diesel plant

October 2001

-October 2002

Plant designing and commissioning for domestic plant in Kanazawa factory as Project Manager 5.75MW x 2 gas engine plant

November 2002

-September 2009

Plant designing and commissioning for the following several plants in domestic and oversea as Project Manager

 -Kangwal textile Co. in Thailand

 -Toyota Motor Thai

 -Eastern Co. in Egypt for Ph.1 & Ph.2

 -Several domestic plant such for Toyota,

 Nissan, etc

 

October 2009

-March 2011

Plant planning and promotion for several plant in domestic and oversea (Indonesia, Brazil, Thailand, South Korea, etc) As Sales engineer

April 2011

-January 2012

Plant designing and commissioning for Emergency power plant due to great east Japan earthquake as Project Manager  

February 2012

-October 2012

Plant planning and promotion for several plant in domestic and oversea such as Gas engine project in Thailand  

November 2012

-March 2014

Plant designing and commissioning for ODA project for Palau Power and Utility Corporation as Project Manager 5MW x 2 diesel plant

April 2014

-March 2015

Plant Planning for several plant in domestic and oversea  
April 2015 Temporary transferred to MHI energy and service Co.  

April 2015

-March 2016

After-sales service works

 -worked for Maui Electric Co. as TA

for one month

 -Project management for gas engine

  Plant in domestic

 

April 2016

    -September 2016

Returned to MHI, but transferred to service section and worked for after-sales service

in Sagamihara factory

 
20th September 2016 Resignation from MHI  
23rd September 2016 Establishment of MKP ENGINEERING CO.  

From establishment up to now

(March 2022)

Business contract record with following Company.

 -ENERES Co. Ltd.

MITSUBISHI HEAVY INDUSTRIES, LTD

 -AKASAKA DIESEL LTD

 -TOKYO ENERGY & SYSTEM INC.

 -GDEC INC.

 

 * I have tripped on business to oversea and recorded as below.

   -Number of business trip : 143 times

   -Number of visited country : 36 countries

   -Total number of day of business trip : 1,490 days

List of Business Trip Country

CERTIFICATE

  • Graduate of Engineering in 1980
  • Masters degree of Engineering in 1982
  • Health supervisor in 1982
  • Dangerous object handler in 1986
  • Specialist for domestic power station in 1988
  • PMP(Project Management Professional) in 2000

My SKILL

  • I used to make MOM or MOU after meeting with foreign Customers in English. And I used to make technical document in English and explain to foreign Customers. Therefore there is no problem for me to make MOM and some document in English.
  • I have made presentation document by using power point software.
  • I have done totaling and making graph by using excel software.
  • When I started designing plant, I visited the site and made several surveys. I gathered the local regulation and practice for the country or site area by going to the electric company, firefighting station and police, etc. Therefore there is no problem for me to go abroad and make several surveys.

My incentive

I am interested in the business of introducing and transferring Japanese technology to developing countries by such as ODA project.
I am glad to do the job that can send some happiness to people in developing countries because we feel convenient and happy in Japan.

I specialize in plant engineering work. Thanks to many experience for oversea plant, I got some knowledge about civil, electricity, regulation, standards,chemistry and logistics besides mechanical one.
I have had lots of experience such as management for schedule, quality, cost and human resource as project manager.

The business regarding environment and energy become more important in the future. Targeting low-carbon society, energy saving, local production for local consumption, smart city and contributed power are more highlighted.
I am glad to do the job contributing the above-mentioned system.

I want to do some help for Japanese company to expand their business to overseas by introducing their goods and technology in English because I can make technical report in English.

It is welcome for me to have a contract between your company and my MKP engineering company.

Best regards,