In 1982, graduated from the master course of Tokyo Institute of Technology,and joined Mitsubishi Heavy Industries, Ltd. and have been engaged on design work for diesel engine power plant for 34 years.
Especially worked for plant of foreign countries, negotiated with customers, had meetings for plant job, had business trip abroad four(4) or five(5) times per year.
In 2016, retired Mitsubishi Heavy Industries, Ltd. and established a company named ‘MKP Engineering LCC’.
Please refer to ‘Business Record’ part.
March, 1976 | Yamanashi Prefecture Kofu First High School Date of Graduation |
March, 1980 | Tokyo Institute of Technology Date of Graduation |
March, 1982 | Master course of Tokyo Institute of Technology Date of Graduation |
※You can scroll horizontally
date | work experience |
remarks |
---|---|---|
April 1982 | Joined Mitsubishi Heavy Industries, Ltd. | |
April 1982 -August 1984 |
Plant planning in Diesel Designing Section, Diesel Department, Yokohama Dockyard | |
September 1984 -March 1988 |
Development of new diesel engine in Diesel development center, Power system headquarters | |
April 1988 -August 1989 |
Plant designing of Japanese ODA project for Liberia Electric Co. (Ph.1&Ph.2) | 5MW x (1+1) diesel plant |
September 1989 -December 1990 |
Plant designing of Japanese ODA project for Senegal Electric Co, | 5MW x 2 diesel plant |
January 1991 -July 1993 |
Plant designing and commissioning for Commonwealth Utilities Corporation in Saipan (Ph.1 & Ph.2) | 13MW x (2+2) diesel plant |
August 1993 -December 1995 |
Plant designing for Japan Power Generation Co. in Pakistan | 5.65MW x 24 diesel plant |
January 1995 -March 1997 |
Plant designing for Hopewell Co. in Philippine as Project Manager for Ph.1 & Ph.2 | 3.75MW x 4 diesel plant |
April 1997 -September 2001 |
Plant designing and commissioning for Full turn key project for Kenya Power Company in Kenya as Project Manager | 12.25MW x 6 diesel plant |
October 2001 -October 2002 |
Plant designing and commissioning for domestic plant in Kanazawa factory as Project Manager | 5.75MW x 2 gas engine plant |
November 2002 -September 2009 |
Plant designing and commissioning for the following several plants in domestic and oversea as Project Manager -Kangwal textile Co. in Thailand -Toyota Motor Thai -Eastern Co. in Egypt for Ph.1 & Ph.2 -Several domestic plant such for Toyota, Nissan, etc |
|
October 2009 -March 2011 |
Plant planning and promotion for several plant in domestic and oversea (Indonesia, Brazil, Thailand, South Korea, etc) | As Sales engineer |
April 2011 -January 2012 |
Plant designing and commissioning for Emergency power plant due to great east Japan earthquake as Project Manager | |
February 2012 -October 2012 |
Plant planning and promotion for several plant in domestic and oversea such as Gas engine project in Thailand | |
November 2012 -March 2014 |
Plant designing and commissioning for ODA project for Palau Power and Utility Corporation as Project Manager | 5MW x 2 diesel plant |
April 2014 -March 2015 |
Plant Planning for several plant in domestic and oversea | |
April 2015 | Temporary transferred to MHI energy and service Co. | |
April 2015 -March 2016 |
After-sales service works -worked for Maui Electric Co. as TA for one month -Project management for gas engine Plant in domestic |
|
April 2016 -September 2016 |
Returned to MHI, but transferred to service section and worked for after-sales service in Sagamihara factory |
|
20th September 2016 | Resignation from MHI | |
23rd September 2016 | Establishment of MKP ENGINEERING CO. | |
From establishment up to now (March 2022) |
Business contract record with following Company. -ENERES Co. Ltd. –MITSUBISHI HEAVY INDUSTRIES, LTD -AKASAKA DIESEL LTD -TOKYO ENERGY & SYSTEM INC. -GDEC INC. |
* I have tripped on business to oversea and recorded as below.
-Number of business trip : 143 times
-Number of visited country : 36 countries
-Total number of day of business trip : 1,490 days
『List of Business Trip Country』
I am interested in the business of introducing and transferring Japanese technology to developing countries by such as ODA project.
I am glad to do the job that can send some happiness to people in developing countries because we feel convenient and happy in Japan.
I specialize in plant engineering work. Thanks to many experience for oversea plant, I got some knowledge about civil, electricity, regulation, standards,chemistry and logistics besides mechanical one.
I have had lots of experience such as management for schedule, quality, cost and human resource as project manager.
The business regarding environment and energy become more important in the future. Targeting low-carbon society, energy saving, local production for local consumption, smart city and contributed power are more highlighted.
I am glad to do the job contributing the above-mentioned system.
I want to do some help for Japanese company to expand their business to overseas by introducing their goods and technology in English because I can make technical report in English.
It is welcome for me to have a contract between your company and my MKP engineering company.
Best regards,